You can have confidence in our ability to efficiently receive, safely store and effectively remove your environmental liability.

Located in Wolseley, Saskatchewan approximately 100 km east of Regina, our facility is positioned adjacent to the TransCanada Highway and within close proximity of both CN and CP rail lines and intermodal terminals. This central location offers numerous cost-effective options for transport that can be individually developed to suit the nature of your shipment and its location.

Our facility includes these special features:

 An integrated Operations and Storage Building constructed on 15 metres of compacted native clay, covered with an impermeable heat welded 60mil HDPE liner, upon which has been placed 460mm of compacted fill and 150mm of steel reinforced concrete.

 A 150mm x 150mm concrete berm surrounds the entire building. All impacted soil and prepared pharmaceutical waste is stored inside and below grade for safe unloading and containment.

 The site design ensures that all surface water is directed safely away from the facility. The sloping of the site toward a central Surface Water Detention Pond, which is lined with a 60mil HDPE, ensures that any surface water inside the two-metre security fence will be contained for analysis.

 The Operations and Storage Building is kept under negative pressure, which prevents any dust created from escaping the premises during sorting, segregation, crushing or screening activities. The environment inside the building is closely monitored and controlled, while the air is constantly removed and filtered though a treatment system. All personnel working with impacted material are required to wear proper personal protective equipment at all times.


All shredding is completed using a 40hp unit specially designed for pharmaceutical waste and post consumer waste which is equipped with a liquid collection system and overhead draft fan and carbon equipped fume hood system.

All activities on the site and within the Facility are monitored and digitally recorded in three 24 hours periods via a closed circuit TV system, which can be remotely accessed.

At PS2 our clients trust that we will manage their liability effectively, ensure the highest standards of environmental protection and that our people are the best at what they do.